Abstract
The evolution process of the surrounding rock failure mechanism is studied because of spalling and roof fall accidents at the top corner of longwall top coal caving faces affected by mining and the difficulty of moving the advanced end support. Methods are proposed to improve the stability of surrounding rocks at the top corner of the end including cutting at the top corner of the end, reinforcing the anchor cable, changing the stress distribution of surrounding rocks at the top corner of the end, and transferring the stress concentration area of surrounding rocks to the deeper rock. Field observations of the surrounding rocks at the top corner of the 15107 fully mechanized caving face show that the stress value of the surrounding rocks at the corner between the roof of the return airway and the coal wall of the working face is 28.9 MPa when the surrounding rocks are in a stable state without mining. The stress value of surrounding rocks at the top corner of the end is 32.3 MPa when it is affected by mining, which results in spalling and roof fall. The surrounding rocks are in a stable state when the maximum stress of the surrounding rocks at the top corner of the reinforced anchor cable’s back-end is 26.1 MPa. The results show that cutting of the surrounding rocks at the top corner of the end and the reinforcement of the anchor cable can avoid the spalling and roof fall when the top corner of the end is affected by mining and can ensure that the end support advances and working face moves forward.
1. Introduction
The roof of the working face-end area of the longwall top coal caving (LTCC) face is affected by many factors such as the forward movement of the working face and the effect of the abutment pressure during the mining, which makes it more difficult to ensure the stability of the roof of the face-end [1]. In the western part of Turkey, Basarir et al. predicated the stresses around main and tail gates during top coal caving by numerical analysis [2]. In Slovenia, Jeromel et al. studied the multilevel longwall top coal caving process by numerical simulations and in situ measurements during coal excavation at different locations in the Velenje Coal Mine [3]. Zang et al. studied the formation and failure process of the triangle hanging plate at the face-end of LTCC by using theoretical analysis, numerical simulation, and field measurement and analyzed the protective effect of the triangle hanging plate to the weak area [4]. Summarizing studies about the stability of the face-end of LTCC, it is generally believed that instability of the face-end can lead to a lower recovery ratio [5–8]. In recent years, experts such as Wang et al., Liu, and Jin et al. [9, 10, 12] proposed to use end support to maximize the strength and area of roof control, to reduce the influence of periodic weighting on the roof fracture, and to enhance the adhesion of surrounding rocks at the top corner of the end to control the stability of the end roof. However, these methods only enhance the support strength of external surrounding rocks and the cohesion of near-distance coal at the top corner of the roadway end from the surface and do not change the stress distribution of surrounding rocks and the failure range of surrounding rocks with mining from the source. Problems such as support movement and maintenance difficulties caused by spalling and roof falling of the end roof affected by mining still cannot be solved under the existing production and support conditions.
Taking the 15107 working face of Erjing Coal Mine as the engineering background, this paper expounds on the failure mechanism and the evolution process of surrounding rocks at the top corner of a fully mechanized caving face under the influence of mining through theoretical analysis and numerical simulation. We examine changing the original stress distribution of surrounding rocks at the top corner of the end to transfer the stress concentration area of the top corner to the deep and to enhance the antimining disturbance ability of the surrounding rocks at the top corner of the end. Industrial field tests verify the feasibility and rationality of the method.
2. Evolution Process of the Failure Mechanism of Surrounding Rocks at the Top Corner of the End
2.1. Engineering Background
The 15107 working face of Erjing Coal Mine is located in the northwest wing of the 15# coal I mining area and is deeply buried with complex geological structures. The working face adopts top coal caving mining technology for a coal thickness of 5 m and a mining and caving ratio of 1.083. The intake and return air roadways are rectangular, and the anchor cable and advanced end support are used to maintain the roof. The existing support methods can basically control the deformation of the roadway roof and two sides. However, the coal wall at the top corner of both ends is loose and unstable because it is affected by the mining of the working face and periodic weighting of the roof. Coal wall bearing capacity of the overlying roof strata is gradually lost. The broken roof and serious subsidence cause spalling and roof fall and difficulty in moving the advanced end support when the working face passes the head and tail of the machine, which will affect the advancing speed of the working face (Figure 1).

2.2. Stress Analysis of Surrounding Rocks at the Top Corner of the End
Lateral pressure of the roadway is biaxially unequal and variable under the influence of mining, especially for geological conditions with deep burial and complex structures. At present, it is impossible to theoretically derive the stress solution of roadway surrounding rocks under the condition of unequal lateral pressure. However, under the assumption that the lateral pressure is equal, the analytical formula of roadway surrounding rock stress is solved according to the elastic-plastic theory. The stress distribution of surrounding rocks and the plastic failure zone are approximately analyzed, along with actual mechanical parameters.
Because the height and width of a roadway are far less than the length of a roadway, the stress calculation of a rectangular roadway is transformed into a plane rectangular strain problem. The analytical formula of surrounding rock stress is obtained by using complex variable function theory and elastic-plastic mechanics theory with and without support [11–17].
According to the complex variable function method, the expression of the stress value of roadway surrounding rocks under the plane strain problem is
In the formula, Φ(z) and Ψ(z) are two analytic functions of complex variable z = x + iy. Re represents the real part of the complex number, z is the complex sum of the complex variable Z, and U is the Airy stress function.
2.2.1. The Surrounding Rock Stress of the Roadway Is Not Subject to Support Resistance
The roadway’s external surrounding rocks in the direction of α-angle with the x-axis are subjected to uniform pressure p, and the roadway’s internal surface is not stressed. As shown in Figure 2, the stress of the external surrounding rocks is consistent, which meets the following relationship:where p denotes the stress of surrounding rocks, X is the surface force in the x-direction of the roadway, and Y is the surface force in the y-direction of the roadway. σθ + σγ = 4ReΦ(ξ) is the stress value of the roadway side; in the roadway side, σγ = 0 and σθ = ξ = cosθ + isinθ after simplification can be obtained.

Assume surrounding rock stress of the roadway without support resistance is .where c0, c1, and c2 represent three coefficients of the mapping function, μ denotes the strain constant, s is the lateral pressure coefficient of the roadway, and θ is the angle.
2.2.2. The Stress of the Roadway Surrounding Rocks Is Only Subject to Support Resistance
The surrounding rocks of the roadway are only supported by the resistance provided by the support body. The support resistance is uniformly distributed, and the roadway surface is not subjected to any shear force. The internal support resistance is shown in Figure 2, which meets the following relationship:
Because σθ + σγ = 4ReΦ(ξ), σγ = 0.
Assume surrounding rock stress of the roadway without support resistance is .
From the derivation of (3) and (5), it can be concluded that the stress calculation formula of the roadway under the combined action of surrounding rock stress is
Since the pressure measurement coefficient of roadway surrounding rocks of the adjacent 15105 working face is 0.4, the pressure measurement coefficient of the 15107 fully mechanized caving face is 0.4 using the engineering analogy method. Combined with the geological data of the 15107 fully mechanized caving face, Mathcad 14 software [18] is used to analyze the overall assignment using formula (6) and illustrated in Figure 3.

The stress concentration area of roadway surrounding rocks mainly exists in the top and bottom corners of the roadway, as shown in Figure 3, and the stress value reaches the maximum at the top and bottom corners, which is close to 30 MPa. The roadway is in a temporary stable state.
As shown in Figure 4, when the vertical stress Y is constant, with the increase of lateral pressure coefficient s, the horizontal stress X increases, and the stress at the top corner of the end increases gradually. When the horizontal stress X is constant, the vertical stress Y increases with the decrease of the lateral pressure coefficient s, and the stress at the top corner of the end decreases gradually. According to the above analysis, the roadway stress is mainly affected by the lateral pressure coefficient s. When the geological and mining conditions are certain, the lateral pressure coefficient s is mainly affected by mining disturbance.

When the end of the working face is disturbed by mining, the stress σθ at the top corner of the two ends is several times of that under static pressure, and the top corner stress σθ increases with the decrease of the distance between the shearer and the end. When the shearer continues to cut coal in the direction of the end and the surrounding rocks’ stress σθ at the top corner of the end reaches a certain critical value, the roof begins to loosen, becomes less stable, and shows fracture failure, and spalling and roof fall accidents occur.
2.3. Numerical Simulation of the Failure Evolution Process of Surrounding Rocks at the Top Corner of the End
FLAC3D was used to simulate the variation of stress in the plastic zone of surrounding rocks at the top corner of the 15107 fully mechanized caving face before and after mining [19–29]. The buried depth of the coal seam is 740 m, the model size is 80 m × 50 m × 60 m, the overlying load is 18.5 MPa, and the horizontal stress is 7.4 MPa. The basic parameters of rock mechanics are shown in Table 1.
Figure 5 illustrates two stress states and plastic zone distribution characteristics of surrounding rocks. The stress concentration area of the roadway surrounding rock is at the top and bottom corner when the working face is not mined. The top corner stress has reached 27.5 MPa. The stress is balanced at the four corners of the roadway, the plastic zone has a butterfly distribution, and the roadway is in a stable state.

(a)

(b)
The top corner stress of the roadway increases from 27.5 MPa to 36.6 MPa in a stable state when the working face is mined. The stress concentration area has narrowed, the surrounding rock has formed shear failure, and the coal body is less stable at the top corner of the end. It is concluded that the rib spalling and roof caving have appeared at the top corner of the end, and the surrounding rock is in an unstable state.
3. Control Scheme of Surrounding Rocks at the Top Corner of the End
3.1. Control Scheme
When spalling and roof fall appear at the end of a fully mechanized caving face, normally, the failure mechanism of surrounding rocks is mitigated by cutting the coal wall near the top corner of the working face. The original stress distribution is changed at the top corner of the end so that the stress concentration area in the surrounding rocks is released at the top corner of the end, and the stress concentration area at the top corner of the end is transferred to the deeper rock. After cutting, the top is supplemented with an anchor cable to strengthen the support strength at the top corner of the end and reduce the probability of coal wall roof instability. Spalling and roof fall accidents must be reduced to ensure the movement of the advanced end support and the mining of the working face.
For the anchor machine to work smoothly after cutting, the wind pick is used to cut at 1 m from the roof, and the width and height are 1 m. After cutting, adding the metal mesh, and patching the anchor cable (φ17.8 mm × 8300 mm) to strengthen support, anchor cable spacing is 0.5 m, row spacing is 1 m, each row is 2 m, and square gasket is 250 mm × 250 mm. When cutting once a day, each cutting length is 4 m to ensure a day of production cycle progress as shown in Figure 6.

3.2. Simulation Test of the Control Scheme
FLAC3D was used to simulate the stress change of the plastic zone of surrounding rocks of the 15107 fully mechanized caving face when it was mined after cutting and reinforcing anchor cables, as shown in Figure 7.

Figure 7 illustrates that when the original stress concentration area of the surrounding rock at the top corner of the end of the air return cross-heading is released, stress concentration area is transferred to the deep part of the top corner of the end, and the maximum stress value at the top corner of the end is also maintained at 27.5 MPa in a stable state. Under the conditions of Figure 7, there is no plastic failure in the surrounding rocks at the top corner, and there are no spalling or roof fall accidents, so the working face can move forward normally.
4. Field Test
The KSE-II-1 borehole stress meter was used to arrange two monitoring stations along the top corner of the return air roadway in the 15107 fully mechanized caving face. Three measuring points were arranged in each monitoring station, as shown in Figure 8. Measuring point 1 was 0.5 m from the exposed coal wall of the top corner with an elevation angle of 30°. The distance between measuring point 2 and measuring point 1 was 1 m, and the distance between measuring point 2 and measuring point 3 was 2 m. The first monitoring station is set at 20 m in front of the working face to monitor the stress change of the surrounding rock at the top corner of the end. The second monitoring station is set at 50 m in front of the working face, which is used to monitor the change of the top corner stress of the end when it is not mined and when it is mined after cutting and reinforcing anchor cables.

Observations from two monitoring stations are calculated and summarized in previous research. The stress changes of the same measuring point in different measuring points and different states were compared and analyzed, and the stress changes of the same measuring point under the influence of mining were compared and analyzed.(1)The stresses of the surrounding rock at measuring points 1, 2, and 3 of the first monitoring station were compared and analyzed when the working face was not mined, mined, and mined after cutting and reinforcing with anchor cables, as shown in Figure 9.(i)Figure 9(a) illustrates that measuring points are affected by the original rock stress at the top corner of the end. The maximum stress value is 28.9 MPa, the stress is relatively concentrated, and there are no spalling and roof fall. When it is mined, the surrounding rock stress concentration area at the top corner of the end is released. Surrounding rock stress value is very low, but spalling and roof fall accidents may occur. When it is mined after cutting and reinforcing with an anchor cable, the surrounding rock stress at the top corner of the end has been released, the stress value is low, and the surrounding rock tends to be stable.(ii)Figure 9(b) shows that when the rock face is not mined, the stress value of measuring point 2 is 32.5 MPa at the top corner of the end, and the coal wall is loose, unstable, and wrapped by the external coal body, which is temporarily in a stable state. When it is mined, the stress value is 38.3 MPa at the top corner of the end, so coal loses stability, and spalling and roof caving occur. After the reinforcement of the anchor cable by cutting, the stress at measuring point 2 is released, the stress concentration area is transferred to the deep rock, and the surrounding rock at the top corner of the end tends to be stable.(iii)Figure 9(c) shows that the stress concentration of the top corner at the end of the working face at measuring point 3 reaches 31.5 MPa without mining and with normal mining, which is gradually reduced compared with measuring point 2. However, because of mining, rib spalling and roof fall accidents are prone to occur. Compared with the stress of measuring point 1 and measuring point 3, the stress at measuring point 3 increases gradually after cutting and reinforcing the anchor cable. Cable reinforcement releases the stress concentration area at the top corner of the end, transfers the stress to the deep rock, and controls the surrounding rock at the top corner of the end.(2)The stresses of the surrounding rock at measuring points 1, 2, and 3 of the second monitoring station were compared and analyzed when the working face was not mined, mined, and mined after cutting and reinforcing with an anchor cable, as shown in Figure 10.(i)Figure 10(a) shows that the stress of measuring points 1, 2, and 3 at the top corner of the end decreases gradually without mining. The stress concentration area is formed at measuring point 1, and the surrounding rock stress at measuring point 1 is the highest, close to 28.9 MPa, which is in a critical state. At 28.9 MPa, mining of the working face is prone to spalling and roof fall accidents.(ii)Figure 10(b) shows that, compared with no mining, the stresses at measuring points 1 and 2 at the top corner of the end have been greatly reduced, indicating that spalling and roof fall accidents may occur at the working face. The stress concentration area is released, and the stress at measuring point 3 exceeds 32.3 MPa, indicating that the spalling and roof fall accidents continue to expand to the deep rock.(iii)Figure 10(c) shows that when mining is carried out after cutting and reinforcing the anchor cable, the stress values of measuring points 1, 2, and 3 are all within 26.1 MPa, and the stress area is relatively concentrated. The stress concentration area of the measuring point around the top corner of the end is released to a certain extent, and there are no spalling or roof fall accidents, so the top corner of the end is controlled during mining.

(a)

(b)

(c)

(a)

(b)

(c)
5. Conclusions
Elastic-plastic mechanics, complex variable function theory, and Mathcad 14 software were used to analyze the stress of surrounding rocks at the top corner of the end. FLAC3D numerical simulation software was used to analyze the stress change of surrounding rocks and the failure of the plastic zone at the top corner of the end before and after the mining of a fully mechanized caving face. With the model, we simulate the evolution process of the failure mechanism of surrounding rocks at the top corner of the end.
The stress of roadway surrounding rocks under unequal lateral pressure is analyzed using elastic-plastic mechanics, complex variable function theory, and Mathcad 14 software. It is concluded that the stress concentration area of roadway surrounding rocks is at the top and bottom corner of the roadway, and the maximum stress value is close to 30 MPa. We analyzed the influence of lateral pressure coefficient on roadway stress. The stress of the roadway increases with the increment of lateral pressure coefficient.
FLAC3D numerical simulation and field monitoring of the KSE-II-1 borehole stress meter were carried out using the failure evolution process of surrounding rocks at the top corner of a fully mechanized caving face. It is concluded that the stress of surrounding rocks is 28.9 MPa when the top corner of the end is stable, and the stress of surrounding rocks is 32.3 MPa when the rib spalling and roof fall occur under the influence of mining.
The stress distribution of the top corner of the end is changed after cutting and reinforcing the anchor cable, and the original stress concentration area is released and transferred to the deep rock. Under the influence of mining, the surrounding rock stress at the top corner of the end is maintained at 26.1 MPa, which is in a stable state.
Data Availability
The data used to support the findings of this study are available from the corresponding author upon request.
Conflicts of Interest
The authors declare that they have no conflicts of interest.
Acknowledgments
This work was supported by Scientific and Technological Innovation Programs of Higher Education Institutions in ShanxiShanxi (2020L0724) and the Engineering Laboratory of Deep Mine Rockburst Disaster Assessment Open Project (LMYK2021009).