Construction Stage Seismic Vulnerability Evaluation of a Continuous Girder Bridge with the Cast-in-Place Cantilever Construction Method
Figure 4
Researched construction stages for the case study bridge. (a) Substructure construction stage. (b) Middle cantilever construction stage. (c) Long cantilever construction stage. (d) Middle span closure construction stage and bridge completion construction stage.