Research Article

Study on Dynamic Evolution of Roof Crack and Support Timing of Secondary Tunneling for Large Section Open-Off Cut in Deep Mines

Figure 6

The development process of roof cracks in the full section and failure mode of roof: (a) Stage I; (b) Stage II; (c) Stage III; (d) dynamic evolution of roof crack after second excavation. (The green cracks represent tensile cracks, and the red cracks represent shear cracks.)
(a)
(b)
(c)
(d)