Research Article

Study on the Lagging Support Mechanism of Anchor Cable in Coal Roadway Based on FLAC3D Modified Model

Table 2

Experimental results of cable bolt pull-out test.

Variable/unitBolt/valueCable/value

Tensile strength (Rm)/MPa5611591
Maximum force (Fm)/kN176.2395.62
Upper yield strength (ReH)/MPa4091532
Upper yield force (FeH)/kN128.46381.21
Lower yield strength (ReL)/MPa4021524
Lower yield force (FeL)/kN128.43379.13