Research Article

Investigation on the Deformation Law of Inner Waste Dump Slope in an Open-Pit Coal Mine: A Case Study in Southeast Inner Mongolia of China

Table 2

The maximum position of the settlement standard and the corresponding filling propulsion position.

Intersection point no.Maximum position of standard settlement (m)Position of fill propulsion (m)Time

x18494Construction period (1 year)
x2145.6188Construction period (2 year)
x3208.7282Construction period (3 year)
x4274376Construction period (4 year)
x5340.9470Construction period (5 year)
x6374.6470Intermission period (0.5 year)
x7407.2470Intermission period (1 year)
x8442.4470Intermission period (1.5 year)