The maximum position of the settlement standard and the corresponding filling propulsion position.
| Intersection point no. | Maximum position of standard settlement (m) | Position of fill propulsion (m) | Time |
| x1 | 84 | 94 | Construction period (1 year) | x2 | 145.6 | 188 | Construction period (2 year) | x3 | 208.7 | 282 | Construction period (3 year) | x4 | 274 | 376 | Construction period (4 year) | x5 | 340.9 | 470 | Construction period (5 year) | x6 | 374.6 | 470 | Intermission period (0.5 year) | x7 | 407.2 | 470 | Intermission period (1 year) | x8 | 442.4 | 470 | Intermission period (1.5 year) |
|
|