Research Article
Temporal and Spatial Effect of Surrounding Rock and Supporting Construction of a Large Soil Tunnel
Table 1
Initial support design parameters.
| | Name | Position | Parameter | | Diameter/mm | Length/m |
| | Hot rolled seamless steel pipe | 140° range of arch | 42 | 4.0 | | Mortar bolt | Sidewall | 22 | | Locking catheter | Arch foot | 42 | | Connecting bar | Between adjacent arches | ɸ22 | | Concrete | Initial spraying | 5 cm | | Second lining arch | 50 cm | | Secondary lining low side wall | 60 cm | | Double lining invert | 27 cm thickness | | Steel arch | Holocycle | Type I20 |
|
|