Research Article

Quantitative Inversion of Water-Inrush Incidents in Mountain Tunnel beneath a Karst Pit

Table 4

Results of the iterative calculation on the flooding algorithm.

Water-inrush incidents123

Maximum height of rainwater accumulation (m)4.04.67.3