Research Article

Risk Early Warning Evaluation of Coal Mine Water Inrush Based on Complex Network and Its Application

Table 1

The most important multiple nodes.

NodesDegree centralityCloseness centralityIntermediary centralityEigenvector centrality

Coal seam thickness14110.333150175
Depth of mining floor failure12030.285557293
Coal seam burial depth9120.21416797
Working surface length6100.630880426
Key position of the water barrier8010.190371529
Karst collapse column5060.320266341
Water inrush volume1011
Fault5030.231522494
Aquifer3020.559491103
Mining depth31.33300.183929612
Water barrier thickness4100.095185764
Karst fissure development degree11.910.511898221
Dynamic water pressure10190.023796441
Collapse column3160.071389323
Ordovician water channel2010.160133171
Mining methods and processes31.200.071389323
Reduce the strength of fractured rock mass1020.13633673
Complex geological conditions2110.047592882
Folds31.650.023796441
Hidden troubles are not in place1100
Illegal production1110
Production organization management chaos1100
Production technology management chaos1120