Statistics of key time nodes in the experiment.
Time node
Experimental phase
December 25th
11 : 56
Excavate the first layer of soil
15 : 13
Install the first layer of steel strut
15 : 35
Excavate the second layer of soil
17 : 28
Install the second layer of steel strut
17 : 57
Excavation to the bottom of foundation pit
December 26th
16 : 00 to 18 : 00
First loading
December 27th
9 : 00 to 13 : 00
Second loading
15 : 00
Connect the water pipe to the water pump and start water injection