Research Article

Prediction of Long-Term Prestress Loss and Crack Resistance Analysis of Corroded Prestressed Concrete Box-Girder Bridges

Table 2

Comparison of experimental and theoretical values of effective prestressing force.

BeamTension stress (MPa)Corrosion rate (%)Mc (kN·m)Texp (kN)Tcal (kN)Tcal/TexpSource

PCB813951.28 (mc)18194184.30.95[37]
CB5139512.06 (mc)16.5177.2166.40.94
CB6139519.47 (mc)15160.3158.30.99
CB7139526.96 (mc)13.5143.5149.31.04
PCB-21312.13.22 (ms)20.7130.1131.91.01[38]
PCB-81312.17.53 (ms)17.5103.999.60.96

Note. mc = maximum cross-sectional area loss rate, ms = mass loss rate, Mc = cracking moment, Texp = experimental value of effective prestressing force calculated based on the cracking moment, and Tcal = theoretical value of effective prestressing force.