Research Article
Stability Analysis of Downstream Dam Expansion Tailings Pond
Table 3
Safety factor values of different solving methods under three working conditions.
| | 
 |  | Condition | New/original reservoir area | Factor of safety | Failure probability (%) |  | Limit equilibrium method | Finite element method | Combination of Monte Carlo method |  | Swedish circle method | SRM | Swedish circle method | SRM |  | 
 |  |  | New | 2.207 | 2.409 | 2.274 | 2.558 | 0 |  | Original | 1.781 | 1.864 | 4.597 | 4.743 | 0 |  | 
 |  |  | New | 2.322 | 2.431 | 2.354 | 2.500 | 0 |  | Original | 2.353 | 2.538 | 5.220 | 6.067 | 0 |  | 
 |  |  | New | 1.936 | 2.073 | 2.074 | 2.147 | 0 |  | 
 | 
 |