Research Article
DLSM Simulation Analysis of the Influence of Blasting Construction on Adjacent Tunnels in Rock Mass with Discontinuities
Figure 8
Schematic diagram of the model when the distance between the discontinuity and the adjacent tunnel is 4 m and 12 m, respectively.