Research Article

Analytical Study on Surface Settlement Troughs Induced by the Sequential Excavation of Adjacent and Parallel Tunnels in Layered Soils

Table 2

Data obtained from measurement and fitting.

Case NO.Monitoring section (m) (m) (m) (m) (mm) (m3/m) (m) (mm) (m3/m)

1CS-8D20.11519.263.853.40.03396.50.147
2SS-5T-52E-S22.22016.453.294.30.0351315.40.501
3S19151510.422.081.90.01078.80.154
4S351516.58.721.741.80.00768.80.131
5HS-217.42017.463.4927.00.236843.70.873
6HS-318.42020.984.1919.10.201729.90.523
7HS-535.62039.917.987.70.1551522.60.733
8HS-637.62042.158.437.00.1481512.80.482
9HS-7442049.269.853.30.083226.40.352
10HS-846.52051.910.384.10.116236.00.347
11H1111312.092.424.40.026619.00.285
12H616.41320.084.026.60.067815.80.316
13H7171321.204.244.30.046917.80.401
14H15141316.773.355.70.048713.90.243

Note: Cases 1-2 are from Project 1, Cases 3-4 are from Project 2, Cases 3–10 are from Project 3, and Cases 11–14 are from Project 4.