Research Article

An Analytical Calculation Method for Displacement Criterion on Tunnel Surrounding Rock Mass Stability

Table 5

Allowable displacement by different methods for the tunnel at Zipingpu project.

Empirical method (mm)Method by regulationNo plastic region method (mm)Method with plastic region (mm)

94.25Not applicable28.6776.98