Research Article

Investigating Trends and Costs Associated with Designing Concrete Mixes Using Different Methods by Computer Programs

Table 7

Comparison between manual and program results for the ACI 211.4R-8 method.

Mix proportionsManualProgramVariation
Numeric%

Cement (kg/m3)334.8337.94−3.14−0.93
Water (kg/m3)188.92188.890.030.02
FA (kg/m3)613.4610.093.310.54
CA (kg/m3)1072.51072.500.00
Fly ash (kg/m3)63.7764.37−0.6−0.93
Superplasticizer (kg/m3)2.392.41−0.02−0.83