Research Article

Design Optimization of Curved Curtain Wall Based on SPEA II-GA-BPNN Algorithm

Table 1

Stage cost impact analysis table.

Project progressBidding stageDecision stageDesign stageConstruction stageCompletion stageQuality warranty

Proportion of cost2% or less2% or less5% or less68–75%2-3%3–5%
Proportion of cost control2% or less15% or more45–65%5–10%2-3%3–5%