Extended Ultimate-Pit-Limit Methodology for Optimizing Surface-to-Underground Mining Transition in Metal Mines

Table 3

Alternative optimal design for surface-to-underground transition in the Dagushan iron mine.

Size of crown pillar (m)Depth of open-pit limit (m)Depth of underground stope roof (m)Total benefit (million CNY)

55−330−3852733.43
54−351−4053300.66
53−367−4203643.94
52−383−4353888.00
51−409−4604114.02
52−428−4804170.73
51−459−5104058.11
50−480−5303859.73
50−485 (original design)−5353794.52