Research Article

Study on Seismic Performance of Connecting Prefabricated Coupling Beam and Shear Wall with Equivalent Bars

Table 2

Test results of specimens.

XJ1ZP1XJ2ZP2
Force/displacement loaded

Specimen cracking60 kN60 kN45 kN50 kN
Concrete began to peel off18 mm18 mm18 mm18 mm
The bearing capacity sharply dropped32 mm20 mm36 mm34 mm