Research Article
Optimization of Suspender Cable Force of Long-Span Concrete Arch Bridges Based on Embedded Matrix Method
Table 1
Measured values of suspender cable forces before cable adjustment (suspenders no. 1∼6 in the upstream of the south bank).
| ||||||||||||||||||||||||||||||||||||||||||||||||||
Note. S-U represents the south bank-upstream. |