Adjusted cables and cable forces before and after adjustment.
| Adjust No | Measured cable force before adjustment (kN) | Objective cable force (kN) | Calculated cable force after adjustment (kN) | Measured cable force after adjustment (kN) | Deviation after adjustment (%) |
| S-U-4 | 1706 | 1921 | 1806 | 1894 | 1.4 | S-D-3 | 1658 | 1930 | 1853 | 1822 | 1.7 | S-D-16 | 1617 | 1807 | 1811 | 1806 | 0.1 | N-D-16 | 1525 | 1807 | 1823 | 1910 | ā4.6 | N-D-15 | 1756 | 1969 | 1948 | 1971 | ā0.1 | N-D-3 | 2163 | 1927 | 1904 | 1916 | 0.6 |
|
|
Note. S-U, S-D, and N-D represent the south bank-upstream, south bank-downstream, and north bank-downstream, respectively.
|