Optimization of Suspender Cable Force of Long-Span Concrete Arch Bridges Based on Embedded Matrix Method

Table 3

Adjusted cables and cable forces before and after adjustment.

Adjust NoMeasured cable force before adjustment (kN)Objective cable force (kN)Calculated cable force after adjustment (kN)Measured cable force after adjustment (kN)Deviation after adjustment (%)

N-D-1277424427420−1.6
N-D-2534454454451−0.7
S-U-9482471475469−1.3
S-U-11485466485468−0.4
S-D-9505462464462−0.4
N-U-9507463467462−1.1
N-U-11503458462454−1.7
N-U-1511471475466−1.9
S-D-2573453455451−0.9
S-U-1265429431424−1.6

Note. S-U, S-D, N-U, and N-D represent the south bank-upstream, south bank-downstream, north bank-upstream, and north bank-downstream, respectively.