Research Article
Load Deflection Relationship of a Solid Slab under the Action of Construction Loads
Figure 18
Typical load time curve for supporting slab due to loads contributed by freshly cast reinforced concrete slab and props (from casting to 28 days) (typical load cell 4 (LC4) and dial gauge position 5 (DG5)).