Advances in Civil Engineering / 2022 / Article / Tab 3 / Research Article
Quantitative Evaluation of the Adaptability of the Shield Machine Based on the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) Table 3 Primary evaluation indices.
Target layer Rule layer Scheme layer Evaluation method of shield-type selection (T ) Geological conditions (C 1 ) Stratigraphic characteristics (u 11 ) Distribution of groundwater (u 12 ) Distribution of harmful gases (u 13 ) Bad geology and geological disasters (u 14 ) Specific rock and soil (u 15 ) Environmental conditions (C 2 ) Existing building (u 21 ) Underground pipelines (u 22 ) Existing urban rail transit and railways (u 23 ) Surface water body (u 24 ) Urban planning land (u 25 ) Vibration and noise (u 26 ) Ground traffic (u 27 ) Disposal of sludge and soil (u 28 ) Shield construction (C 3 ) Propulsion speed (u 31 ) Rotation speed of the cutter head (u 32 ) Grouting pressure (u 33 ) Soil pressure (u 34 ) Design of shield machine (C 4 ) Total thrust (u 41 ) Main drive torque (u 42 ) Grouting ability (u 43 ) Number of muck improvement openings (u 44 ) Type of cutting tools (u 45 ) Slagging quantity of screw conveyor (u 46 ) Spacing design of cutting tool (u 47 )