Quantitative Evaluation of the Adaptability of the Shield Machine Based on the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) Table 8 Final evaluation indices.
Target layer Rule layer Scheme layer Evaluation method of shield-type selection (T ) Environmental conditions (C 2 ) Existing building (u 21 ) Underground pipelines (u 22 ) Shield construction (C 3 ) Propulsion speed (u 31 ) Rotation speed of the cutter head (u 32 ) Grouting pressure (u 33 ) Design of shield machine (C 4 ) Total thrust (u 41 ) Main drive torque (u 42 ) Grouting ability (u 43 ) Number of muck improvement openings (u 44 ) Type of cutting tools (u 45 ) Slagging quantity of screw conveyor (u 46 )