Research Article
Study on the Mechanism and Effect of a Partition Wall Controlling Foundation Pit Deformation in the Soft-Soil Area
Table 1
The basic statistics of the excavation with an open cut.
| Serial number | Station | Excavation length L (m) | Excavation width B (m) | Excavation depth He (m) | Depth of retaining structure into soil H (m) | The wall thickness t (m) |
| 1 | Dan Bei road station | 199.9 | 19.5 | 16.2 | 33 | 0.8 | 2 | Vocational college station | 241.6 | 20.5 | 16.4 | 29 | 0.8 | 3 | The Huaihe river road station | 205.4 | 20.7 | 16.8 | 34.4 | 0.8 | 4 | Chishing road station | 203.8 | 20.7 | 16.9 | 34.7 | 0.8 | 5 | Siyuan road station | 191.08 | 20.7 | 17.0 | 31.9 | 0.8 | 6 | JianChang way station | 294.2 | 20.7 | 16.7 | 34 | 0.8 | 7 | Yueyahe road station | 183.8 | 20.7 | 16.7 | 41.5 | 0.8 | 8 | LingBin road station | 153.6 | 37.6 | 16.9 | 31.1 | 0.8 | 9 | Nanhezhuang station | 202.4 | 20.7 | 15.4 | 32.5 | 0.8 | 10 | Dabizhuang station | 205.5 | 20.7 | 16.8 | 32 | 0.8 | 11 | Admiralty street station | 499.9 | 20.7 | 16.6 | 34.1 | 0.8 | 12 | Xuzhuangzi station | 228.5 | 20.7 | 16.5 | 32 | 0.8 | 13 | Affiliated middle school station | 307.6 | 29.6 | 16.8 | 30.5 | 0.8 | 14 | North of bamboo station | 167 | 23.1 | 24.0 | 42 | 1 | 15 | Yibin road station | 207 | 20.7 | 15.9 | 31.6 | 0.8 | 16 | Anshan west road station | 223.3 | 22.7 | 16.8 | 29.0 | 0.8 | 17 | Day tow station | 284.3 | 20.7 | 16.6 | 31.5 | 0.8 | 18 | First central hospital station | 180.6 | 40.6 | 16.8 | 29.6 | 0.8 | 19 | Yukon beam way station | 235 | 20.7 | 16.9 | 30.5 | 0.8 | 20 | Cultural centre station | 168 | 25.05 | 24.5 | 52.6 | 1 |
|
|