Research Article
Study on the Mechanism and Effect of a Partition Wall Controlling Foundation Pit Deformation in the Soft-Soil Area
Table 2
Main excavated conditions of the foundation pit.
| Working condition | The construction content | Excavation depth |
| I | Initial geostress | — | II | Construction of retaining structure and partition wall | — | III | 1 m excavation, set up the first concrete support | 1 m | IV | The first layer of soil excavation, set up a second steel support | 4 m | V | The second layer of soil excavation, set up a third steel support | 4 m | VI | The third layer of soil excavation, set up the fourth steel support | 4 m | VII | The fourth layer of soil excavation, excavation to the end | 4 m |
|
|