Research Article

Safety Assessment of Ship Collision with Piers under the Protection of Anti-Collision Floating Box Based on BIM Technology

Table 6

Comparison table for calculating example.

ConditionsLiterature [22]This studyDeviation between the literature and this study
Maximum impact force (MN)Time of occurrence (s)Maximum impact force (MN)Time of occurrence (s)Deviation of maximum impact force (%)Deviation of time (%)

14.0720.9014.2520.9314.423.33
27.2340.8997.4620.9093.151.11
39.8880.86810.2890.8664.06āˆ’0.23
47.4530.8757.6670.8992.872.74
513.1120.64813.6670.6524.230.62
615.8130.58916.5590.5614.72āˆ’4.75