Research Article

Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge

Figure 8

Cross-sectional layout drawing of the deflection measuring point of the steel box girder. (a) The layout of the cross-sectional survey points. (b) Object picture of measuring-point arrangement.
(a)
(b)