Research Article
Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge
Figure 9
Layout drawing of stress measurement points. (a) The layout of the cross-sectional survey points. (b) Longitudinal survey points on the beam top. (c) Survey points on both sides of the web.
(a) |
(b) |
(c) |