Research Article

Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge

Figure 9

Layout drawing of stress measurement points. (a) The layout of the cross-sectional survey points. (b) Longitudinal survey points on the beam top. (c) Survey points on both sides of the web.
(a)
(b)
(c)