Research Article

Coordinate Monitoring Technology in the Process of Incremental Launching Construction of Curved Steel Box Girder Bridge

Table 3

Stress monitoring value and theoretical value of key sections of steel box girder.

Construction statusIncremental launching statusSection location and measuring point layoutTheoretical value (MPa)Monitoring value (MPa)Error rate (%)Strength limit (MPa)

Condition 1The moment of lifting jackVertical measuring point of section 125.8121.21−17.82160.0
Vertical measuring point of section 221.5618.58−13.82160.0
Longitudinal measuring point of section 323.8022.87−3.91275.0
Condition 2(1)Temporary steel pier unloaded incompletelyVertical measuring point of section 185.9993.739.00160.0

Condition 2(2)The moment of lifting jackVertical measuring point of section 175.9975.39−0.79160.0
Vertical measuring point of section 222.4824.729.96160.0
Longitudinal measuring point of section 36.567.5114.48275.0

Condition 3Before lowering downVertical measuring point of section 138.5033.37−13.32160.0
Vertical measuring point of section 236.6334.40−6.09160.0
Longitudinal measuring point of section 231.4527.40−12.88275.0
Vertical measuring point of section 334.7029.25−15.71160.0
Longitudinal measuring point of section 434.9130.48−12.69275.0

Note. Error rate = (monitoring value − theoretical value) × 100%/theoretical value.