Stress monitoring value and theoretical value of key sections of steel box girder.
| Construction status | Incremental launching status | Section location and measuring point layout | Theoretical value (MPa) | Monitoring value (MPa) | Error rate (%) | Strength limit (MPa) |
| Condition 1 | The moment of lifting jack | Vertical measuring point of section 1 | 25.81 | 21.21 | −17.82 | 160.0 | Vertical measuring point of section 2 | 21.56 | 18.58 | −13.82 | 160.0 | Longitudinal measuring point of section 3 | 23.80 | 22.87 | −3.91 | 275.0 | Condition 2(1) | Temporary steel pier unloaded incompletely | Vertical measuring point of section 1 | 85.99 | 93.73 | 9.00 | 160.0 |
| Condition 2(2) | The moment of lifting jack | Vertical measuring point of section 1 | 75.99 | 75.39 | −0.79 | 160.0 | Vertical measuring point of section 2 | 22.48 | 24.72 | 9.96 | 160.0 | Longitudinal measuring point of section 3 | 6.56 | 7.51 | 14.48 | 275.0 |
| Condition 3 | Before lowering down | Vertical measuring point of section 1 | 38.50 | 33.37 | −13.32 | 160.0 | Vertical measuring point of section 2 | 36.63 | 34.40 | −6.09 | 160.0 | Longitudinal measuring point of section 2 | 31.45 | 27.40 | −12.88 | 275.0 | Vertical measuring point of section 3 | 34.70 | 29.25 | −15.71 | 160.0 | Longitudinal measuring point of section 4 | 34.91 | 30.48 | −12.69 | 275.0 |
|
|
Note. Error rate = (monitoring value − theoretical value) × 100%/theoretical value.
|