Research Article
Prediction Method of TBM Tunneling Parameters Based on Bi-GRU-ATT Model
Table 1
Evaluation indexes of prediction results of Bi-GRU-ATT model.
| Model | Parameter | | | | |
| Bi-GRU-ATT | Total thrust | 1.01 | 0.925 | 151.52 | 193.62 | Penetration | 1.60 | 0.930 | 0.15 | 0.20 | Cutterhead torque | 1.40 | 0.936 | 31.30 | 44.44 | Cutterhead power | 1.71 | 0.944 | 34.13 | 34.75 |
|
|