Research Article

Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling

Figure 19

Longitudinal ground settlement of shield and pipe jacking under different elastic modulus: (a) Longitudinal settlement of shield. (b) Longitudinal settlement of pipe jacking.
(a)
(b)