Research Article
Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling
Figure 19
Longitudinal ground settlement of shield and pipe jacking under different elastic modulus: (a) Longitudinal settlement of shield. (b) Longitudinal settlement of pipe jacking.
(a) |
(b) |