Research Article

Differential Analysis and Prediction Optimization of Ground Surface Settlement Induced by Quasi-Rectangular Shield and Pipe Jacking Tunnelling

Table 1

Model size and structural parameters.

NameX (m)Y (m)Z (m)E (GPa)Neutral pillarReduction factorEquivalent layer (m)

Shield172674220.7 (C50)Yes0.60.2
Pipe jacking84674234.5 (C50)No1.00.06