Research Article

Analysis of Crustal Stress and Its Influence on the Stability of the Deep Tunnel in the Huanaote Mining Area

Table 4

Ratio of the maximum horizontal principal stress to vertical principal stress.

No.1234567

σh.max/1.891.681.571.801.701.891.78