Research Article

Dynamic Risk Assessment of Karst Tunnel Collapse Based on Fuzzy-AHP: A Case Study of the LianHuaShan Tunnel, China

Table 6

Judgment matrix of layer C to layer B.

C111C112C131C132C133C141C142C311C312C313C314C321C322C323

C11117C13111/51/7C14111/4C3111358C32111/54
C1121/71C132511/3C14241C3121/3123C322519
Feature vector
W = {0.88, 0.13}T
Satisfying consistency
C133731Feature vector
W = {0.20, 0.80}T
Satisfying consistency
C3131/51/212C3231/41/91
Feature vector
W = {0.07, 0.28, 0.65}T
λmax = 4.25, CI = 0.03,
CR = 0.06 < 0
Satisfying consistency
C3141/81/31/21Feature vector
W = {0.19, 0.74, 0.06}T
λmax = 3.07, CI = 0.036,
CR = 0.069 < 0.1,
Satisfying consistency
Feature vector:
W = {0.60, 0.21, 0.12, 0.07}T
λmax = 4.01, CI = 0.004,
CR = 0.004 < 0.1,
Satisfying consistency