Research Article

Study on the Support System Mechanism of Entry Roof with Roof Cutting Pressure Releasing Gob-Side Entry Retaining Technology

Figure 15

Monitoring results. (a) Gangue wall maintenance support pressure. (b) Constant resistance anchor cable stress. (c) Roof separation. (d) Single hydraulic prop support pressure.
(a)
(b)
(c)
(d)