Research Article

Study on the Support System Mechanism of Entry Roof with Roof Cutting Pressure Releasing Gob-Side Entry Retaining Technology

Figure 18

Typical monitoring results at footage 500 m. (a) Monitoring of roof and floor approaching. (b) Monitoring of both walls approaching.
(a)
(b)