Research Article

Estimation of Annual Routine Maintenance Cost for Highway Tunnels

Table 3

Partial and part correlation analysis.

DependentIndependentControlled variablePartialPart

TMCTimeAgeAADT, ESAL, ∑ESAL, and PSLT0.4150.382
∑ESALAADTT, Age, AADT, and ESAL−0.192−0.163
TrafficAADTAge, ESAL, ∑ESAL, AADTT, and NT0.4100.348
ESALPMLT,Age, AADT, ∑ESAL, and PMLT0.0760.062
AADTTAge, AADT, ESAL, ∑ESAL, NT, and PMLT−0.043−0.033
PTTPMLT, PST, and NT−0.099−0.095
Tunnel parametersNTAADTT, AADT, PSLT, PLT, PMLT, PST, and NLF−0.180−0.134
PSLTAge, PMLT, and VNF−0.059−0.052
PLTNT, PLT, and NLF0.1150.109
PMLTESAL, AADTT, PTT, NT, PSLT, PLT, PST, and VNF−0.401−0.330
PSTAADTT, NT, PLT, PMLT, and NLF0.2660.250
NVFPSLT and PMLT−0.274−0.266
NLFNT, PLT, and PST−0.094−0.089