Research Article
Estimation of Annual Routine Maintenance Cost for Highway Tunnels
Table 6
Fixed-effect regression model.
| Variables | Beta | β | t | |
| lnAge | 0.685 | 1.222 | 3.60 | 0.001 | lnAADT | −1.032 | −0.604 | −3.33 | 0.002 | PTT | 0.469 | 2.881 | 2.72 | 0.010 | PSLT | 0.128 | 1.972 | 1.14 | 0.259 | PLT | 0.210 | 1.302 | 1.35 | 0.184 | PMLT | −0.049 | −0.564 | −0.22 | 0.826 | lnNVF | −0.681 | −1.334 | −2.81 | 0.008 | Constant | 1 | 8.788 | 3.39 | 0.002 | Guanzhong | 0.896 | 10.944 | 2.53 | 0.016 | Shannan | 0.898 | 11.012 | 2.49 | 0.017 | R2 | 0.4771 | F | 5.47 | | 0.0001 |
|
|