Decomposition of the large complex bridge construction process.

Unit projectSubproject

Foundation engineering a1Support construction a11, pile foundation engineering a12, cofferdam construction a13, boxed construction a14, underwater concrete a15
Temporary engineering a2Floating bridge construction a21, steel trestle construction a22, scaffold engineering a23, operation machinery a24, crane operation a25
Tower column engineering a3Formwork construction a31, cable engineering a32, concrete pouring engineering a33
Beam slab engineering a4Hanging basket construction a41, box girder hoisting a42, prestressed construction a43