Research Article
Safety Risk Evaluation of Large and Complex Bridges during Construction Based on the Delphi-Improved FAHP-Factor Analysis Method
Table 6
Risk source identification table established using the WBS-RBS method.
| Project | Risk sources | Human risk E1 | Machine material risk E2 | Environmental risk E3 | Construction technology impact E4 |
| Foundation pit engineering (A) | Foundation pit excavation A11 | … | … | … | … | Foundation pit support A12 | … | … | … | … |
| Pile foundation construction (B) | Equipment transportation and installation B11 | … | … | … | … | Embedded casing B12 | … | … | … | … | Drilling with drilling machine B13 | … | … | … | … | Hole cleaning B14 | … | … | … | … | Hoisting reinforcement cage B15 | … | … | … | … | Underwater concrete pouring B16 | … | … | … | … |
| Pile cap construction (C) | Boxed cofferdam C11 | … | … | … | … | Cofferdam hoisting C12 | … | … | … | … | Pile cap construction C13 | … | … | … | … | Formwork engineering C14 | … | … | … | … |
| Other(D) | Construction electricity D11 | … | … | … | … | Fire prevention on-site D12 | … | … | … | … |
|
|