Research Article
Safety Risk Evaluation of Large and Complex Bridges during Construction Based on the Delphi-Improved FAHP-Factor Analysis Method
Table 6
Risk source identification table established using the WBS-RBS method.
| | 
 |  | Project | Risk sources |  | Human risk E1 | Machine material risk E2 | Environmental risk E3 | Construction technology impact E4 |  | 
 |  | Foundation pit engineering (A) | Foundation pit excavation A11 | … | … | … | … |  | Foundation pit support A12 | … | … | … | … |  | 
 |  | Pile foundation construction (B) | Equipment transportation and installation B11 | … | … | … | … |  | Embedded casing B12 | … | … | … | … |  | Drilling with drilling machine B13 | … | … | … | … |  | Hole cleaning B14 | … | … | … | … |  | Hoisting reinforcement cage B15 | … | … | … | … |  | Underwater concrete pouring B16 | … | … | … | … |  | 
 |  | Pile cap construction (C) | Boxed cofferdam C11 | … | … | … | … |  | Cofferdam hoisting C12 | … | … | … | … |  | Pile cap construction C13 | … | … | … | … |  | Formwork engineering C14 | … | … | … | … |  | 
 |  | Other(D) | Construction electricity D11 | … | … | … | … |  | Fire prevention on-site D12 | … | … | … | … |  | 
 | 
 |