Research Article
Stability Analysis of Blasting Excavation for High Rock Slope of Highway Reconstruction and Expansion
Figure 13
Time-history curves of vibration velocity at different measurement points at different positions and different times during millisecond blasting. (a) On the slope toe. (b) On the slope top. (c) On the slope surface.
(a) |
(b) |
(c) |