Research Article

Stability Analysis of Blasting Excavation for High Rock Slope of Highway Reconstruction and Expansion

Figure 17

Time-history curve of the vibration velocity of different measurement points at different positions and different times during simultaneous detonation. (a) On the slope toe. (b) On the slope top. (c) On the slope surface.
(a)
(b)
(c)