Research Article
Stability Analysis of Blasting Excavation for High Rock Slope of Highway Reconstruction and Expansion
Figure 8
Slope stress field nephogram at different blasting periods. (a) 75 ms. (b) 150 ms. (c) 225 ms. (d) 300 ms.
(a) |
(b) |
(c) |
(d) |