Research Article

Stability Analysis of Blasting Excavation for High Rock Slope of Highway Reconstruction and Expansion

Figure 9

Stress nephogram after the third blasthole detonation. (a) 150 ms. (b) 155 ms. (c) 170 ms. (d) 200 ms.
(a)
(b)
(c)
(d)