Research Article

Stability Analysis of Blasting Excavation for High Rock Slope of Highway Reconstruction and Expansion

Table 3

Accumulated displacement change before and after blasting (unit: mm).

PositionTop of the slopeThird-grade platformSecond-grade platform
Point number010203040506070809101112

Before blasting11.210.010.310.610.810.511.111.14.13.23.04.1
After blasting12.310.911.211.812.312.112.712.55.85.14.95.8
Displacement difference1.10.90.91.21.51.61.61.41.71.91.91.7
Average value1.0251.5251.8