Research Article

Physical Modeling of a Shallow-Buried Metro Tunnel in the Soft Loess Layer Using Similarity Theory

Table 5

Stress release of surrounding rock under different construction methods.

Working conditionCondition 1Condition 2Condition 3Condition 4Condition 5Condition 6

Final stress/initial stress3.697.364.404.135.524.11