Research Article

Study on Settlement Influence of Newly Excavated Tunnel Undercrossing Large Diameter Pipeline

Table 4

Comparison of simulation results of construction schemes.

Construction schemeMaximum settlement of pipeline (mm)Differential settlement on both sides of pipeline (mm)Construction period

145.511Longer
236.613Moderate
335.510Moderate