Research Article

Discrete Element Simulation and Monitoring Analysis of Different Construction Methods of the Shallow Buried Bias Tunnel

Figure 14

Distribution of crack in surrounding rock with different construction methods: (a) work condition 1: the three-step method without systematic bolt; (b) work condition 2: the three-step method with systematic bolt.
(a)
(b)