Research Article

Discrete Element Simulation and Monitoring Analysis of Different Construction Methods of the Shallow Buried Bias Tunnel

Figure 16

Pressure arch distribution diagram: (a) work condition 1: the three-step method without systematic bolt; (b) work condition 2: three-step method with systematic bolt.
(a)
(b)